SKS Group Co. WLL, achieves ISO 9001:2000 Quality Management System Certification - SKS Group Co. WLL announces the grant of ‘International Organization for Standardization’ (ISO) 9001:2000 certificate on 5th December 2007, through Germanischer Lloyd Certification (GLC). ISO 9001 is the internationally recognized standard for Quality Management Systems and shows our company commitment towards Quality Management practices. - SKS Group has receives safety performance Awards - Kuwait National Petroleum Company (KNPC) The award is granted to SKS Group for the best safety performance record while performing following project: 1- Erection, Commissioning & Start-up of modifications of existing ARD off-gas compressors C-48-051 & C-88-051 CA/PD/3631 2-Additional Dry slop air cooler for RMP & FUP Units - CA/PD/3672 - KGOC – SAC {Kuwait Gulf Oil Company & Saudi Chevron) Joint Operation Inc. Wafra Awarded SKS Group with Certificate of Excellent Performance for Modification of Tanks. SKS Group celebrates 8 (to be checked for correctness and data availability) million safe man-hours without accidents On May 10, 2010. - SKS Group Co WLL achieved a record safety milestone by achieving 8 million safe-man hours without a lost work-day injury for the first time in the company’s history. The safe man-hours include all SKS Group employees, as well as contractors working for the company. - Working 8 Million safe-man hours without a lost-work-day injury is a wonderful achievement and was accomplished through every employee’s commitment to overall safety behavior.  
 
 
        LIST OF Industrial Surface Coating & Lining / Painting & Insulation Projects
S.No.
Project Title
 Location
Brief Scope of work
Duration  Client
Status
1
KOC Crude Export Facilities Piping works at NPP & MS, STF Area - Internal & External Paint works, KOC KOC North Tank Farm Area Surface preparation Internal Blasting & Painting And Application of Heat Shrinking Sleeves & Ultra High Built Epoxy works 8   Month Hyundai Heavy Industries Co. Ltd. / Mechanical Engg. & Cont. Co.W.L.L. Completed
2 FMP Blasting and Painting of Steel Structure as per KOC Specification (3 Phases) MAB YARD Surface preparation, Blasting & Painting works 7   Month SK Engg. & Const. Co.Ltd., Kuwait Completed
3 Blasting & Painting External, Internal & Cut Back Spools KOC Crude Export Facility NORTH & SOUTH TANK FARM Area Surface preparation, Blasting & Painting works 4   Month Mechanical Engg. & Cont. Co.W.L.L., Kuwait Completed
4 Painting works for Utilities & Associated systems for Petroleum Coke Calcinations Plant Project, PCIC, Shuaiba PCIC, Shuaiba Authority Area Painting & Civil Works 6   Month Human & Technologies Corporation, Korea Completed
5 Tank Painting Works KOC Crude Export Facility North & South Tank Farm Area Surface preparation, Blasting & Painting works for Mega Tanks: Internal and External 8   Month Kuwait Oil Company / Hyundai Heavy Industries Completed
6 Surface Preparation & Painting Works with KPPC Equate Surface preparation, Blasting & Painting works 22 Month SBC General Trading & Contracting. Co. - KPPC, Kuwait Completed
7 Painting works for structural steel GC - 11 Surface preparation, Blasting, Painting and scaffolding works 4   Month SK Engg. & Const. Co.Ltd., Kuwait Completed
8 KOC-42375 - HBE Coating for Pipes KOC South, East Area Wrapping Tape removal.insitu Blasting & External Coating with HBE(Interzone 485)inside KOC South and East Kuwait 21 Month Kuwait Oil Company /Arabi Entertech Completed
9 JOHC092FEB09-Wafra Trunk lines Replacement at JO Wafra JO Wafra External Painting works in 20inch Pipe 2   Month KGOC - JO Wafra /F&K Ibrahim Al-Shuwayer Completed
10 Blasting & Painting KOC Blasting & Painting of Pipes & Spools 6   Month Metalex /KOC Completed
11 Blasting & Painting for pipe spools KOC Blasting & Painting of Pipes & Spools 5   Month National Kharafi Completed
12 Contract No :42153 - Installation of Flow line and Associated works in SEK area SEK Area -Kuwait Blasting (External & Internal) application, Internal epoxy lining & external Highbuld epoxy 34  Month MECC / KOC Completed
13 Spool Pipes Painting of work MAB Spool Pipes painting work 10  Month Daelim -KNPC Completed
14 JO-SC-214-CD-008- Project and Construction Services JO Wafra Blasting ,External & Internal Painting, wrapping and insulation 61 Month KGOC - JO Wafra /CGC Completed
15 Painting (SMP-1) Works North LPG Tank Project KNPC MAA Painting Works 24 Month GS Engineering Completed
 

Last Update 10-10-2015

 